A Loo With a View
It took 810 days and cost €60m to renovate the Mercedes Benz Arena, and Stuttgart made sure that investing all the time and money was absolutely worth it. Most notably, the running track is gone, of course, and the capacity has been bumped to 60441. But some thought has also been put into the rest of the match day experience, resulting in the men's toilets behind the curve offering a view onto the field.
The Offside: Bundesliga @ Aug 12, 2011 10:00 AM EDT | Blog Profile
Related
- Germany Edge Brazil 3-2 In Thriller
- Man Utd 3-0 Tottenham: Welbeck Dazzles As United Cruise Past Spurs (Photos)
- Matchday 1: Borussia Dortmund Here and the Other 17 Clubs Over There
- Once Upon a Time in Mönchengladbach
- The Longest Beard in German Football
- The Kids Are Alright, Dortmund Edition
- Mario Götze’s Backheel Nutmeg Pass
- Koln Fans Provide Showers, Golden And Otherwise
